Calculator

How much microcement do I need?

Two tools in one place: find the right microcement system for your surface, then turn your square metres into the exact kits to order — with live KCBerry prices.

Which system do I need?

Six questions. Every recommendation below is the build-up KCBerry already specifies for that surface — nothing is improvised.

Step 1

What are you coating?

Step 2

Indoor or outdoor?

Step 3

Is it a wet area?

Step 4

Is it going over existing tiles?

Step 5

Approximate square metres

Walls plus floor — this feeds the kit calculator below.

Step 6

Who is applying it?

Your recommended system

Answer the questions and your build-up appears here — system, products in order, and the sealer to finish with.

Kit calculator

Enter your area and we search every combination of the 10, 20, 30, 40, 50 and 60 m² Complete Kits to find the cheapest set that fully covers it.

Enter your square metres to see the kits, the coverage delivered and the total.

How microcement quantities are actually calculated

Microcement is sold by weight and applied by area, and the bridge between the two is consumption per square metre per coat. A KCBerry build-up is not one material but four in sequence, each with its own figure. KC Primer keys the coating to the substrate. Microcement Base goes on at roughly 1.2 kg/m² per pass, and it is always two passes with fibreglass mesh embedded between them — so 2.4 kg/m² in practice, or around 8–10 m² from a 20 kg bag. Then the finish: Microfinishing at about 0.6 kg/m² per coat, or Microtraffic at about 0.9 kg/m² per coat, again over two passes. Finally the 2K polyurethane sealer, which is what turns a mineral coating into a waterproof, cleanable surface.

That is why a Complete Kit is not simply "so many bags". Each kit is pre-portioned for its stated area across all four components, and because the finish coat is chosen at checkout, the kit ships a different bag count depending on whether you specify Microfinishing or Microtraffic. Buying the components separately is possible and sometimes right for a small repair, but for a whole room the kit is both cheaper and far harder to get wrong.

Why bathrooms are measured wall by wall

The single most common mistake we see is a customer quoting us their floor area. A 6 m² bathroom floor sounds like a small job until you add four walls at 2.4 m high, the shower enclosure, the vanity front and the splashback — and the project turns out to be 25 to 30 m² of coated surface. Measure each plane: length × height for every wall you intend to coat, length × width for the floor, and the shower separately because it may be specified in Micronoslip rather than the wall finish. Deduct only the large openings — a door or a window — and leave the small ones in; they cost you nothing and they buy you margin. Bathrooms also carry more sealed square metres per square metre of floor than any other room, which is the figure that surprises people costing their first project.

What changes when you go over tiles

Nothing, as far as quantity is concerned. Microcement bonds directly to sound ceramic and porcelain after priming, and it goes on at the same 2–3 mm total build, so a 20 m² tiled bathroom needs exactly the same materials as a 20 m² plastered one. What changes is preparation: tiles must be firmly bedded, degreased and primed, and any loose or drummy tile has to be removed and made good first. This is the whole commercial argument for microcement in a renovation — no demolition, no skip, no re-screeding, and a room that stays usable for most of the work.

When to add wastage

A trained applicator working a simple rectangular floor wastes very little. A first-time DIY applicator working a bathroom with a shower niche, a window reveal and an awkward corner wastes noticeably more — in mixing, in practice passes, and in the material that never quite makes it off the trowel. That is why the 10% allowance in the calculator is switched off by default and labelled as a recommendation: it is genuinely optional on a straightforward surface and genuinely sensible on a complicated one. If you are applying it yourself, or if the room has a lot of detail, take the 10%. Surplus material in the same colour batch is also useful insurance — colour is mixed per order, and matching a batch months later is not something we would promise.

Once you have your figure, the calculator above does the commercial part: larger kits carry a lower cost per square metre, so the cheapest answer is rarely the next size up. Compare it against the full pricing page, read the application guide before you order, and if the numbers matter commercially, send them to us — we check them for free.

Calculator questions

How much microcement do I need per square metre?
A KCBerry build-up uses roughly 1.2 kg/m² per Base coat over two passes (2.4 kg/m² in total), then either 0.6 kg/m² per Microfinishing coat or 0.9 kg/m² per Microtraffic coat, again over two passes. Primer and 2K sealer are supplied in KCBerry's own pack sizes, portioned per square metre in every Complete Kit.
Do I measure the floor only, or the walls too?
Measure every surface you intend to coat. In a bathroom the walls almost always exceed the floor area, so a room with 6 m² of floor can easily be a 25 m² microcement project once the walls, shower and vanity are counted.
Should I add extra for wastage?
We recommend adding around 10% for cuts, mixing losses and practice passes, especially on a first project. It is a recommendation rather than a rule — the calculator leaves it switched off so you can see the bare figure first.
Is it cheaper to buy one large kit or several smaller ones?
Larger kits carry a lower cost per square metre, so the calculator searches every combination of the 10, 20, 30, 40, 50 and 60 m² kits and returns the cheapest set that fully covers your area — not simply the next size up.
Does applying over tiles change the quantity?
No. Microcement is applied at the same 2–3 mm build-up over sound tiles as over plaster or concrete, so the coverage figures are unchanged. What changes is the preparation: the tiles must be firmly bedded and primed before the Base coat goes on.
What if my project is larger than 200 square metres?
Projects above 200 m² are quoted directly rather than bought as stacked kits, so we can price the materials, the colour batch and the delivery as one specification. Send us the drawings and the square-metre count and we will come back with a full quotation.

Want us to check your figures?

Send the room dimensions and we will specify the exact system, colour and quantity.