Guide

How to apply microcement.

Four stages, from substrate preparation to sealing. Read the full method below or download our PDF after checkout.

  1. 01

    Prepare the substrate

    Clean and degrease tiles, plaster or concrete. Repair cracks. Sand glossy surfaces lightly. Apply our bonding primer and allow approximately 1 hour to dry.

  2. 02

    Apply Microbase (2 coats; 3 coats with mesh on floors)

    Apply Microbase with a trowel. Wet on dry: allow about 3 hours and sand lightly before the next coat. Apply 2 coats; on floors, apply 3 coats with fibre mesh.

  3. 03

    Apply Microfinishing or Microtraffic (2 coats)

    Apply your chosen finish coat thinly with a steel trowel. Wet on dry: allow about 3 hours and sand lightly before the next coat. Use Microfinishing on walls only, or Microtraffic on floors.

  4. 04

    Seal

    Roll on the first coat of 2-component polyurethane sealer. Allow 8 hours to 2 days between coats. Apply the second sealer coat. Follow the technical data sheet for curing and use.

Before you order, work out the quantity with the microcement calculator — coverage per coat, kits needed and the 10% wastage allowance, all in one place. For coverage rates, drying times and performance data, see the technical data sheets.

Applying it for a living? Apply for a KCBerry trade account. Writing it into a drawing set? See how to specify microcement.

Buy the kit, apply it yourself.

Every KCBerry kit includes everything you need plus printed instructions.